Product Idea |

Caesar Palace Las Vegas

14 comments
On

Ground floor

The first part of the structure is closed. Now we have to strengthen all with beams maintains that the walls do not deviate and they may in future support the floors of the building. The interior will be done later .

Next step :

- Strengthen the whole of the lower part

- Roof constrcution

Opens in a new window