Help your fellow builder by leaving your feedback based on these three criteria:
- Originality: How original is this - never seen before?
- Building Techniques: How much skill do you think the creator of this MOC has, in terms of building technique?
- Details: Express how much you like the details of the build.
Your feedback is only shown to the creator as well as yourself. It is not available for other users to see. The creator won't see your user name.
It happens once in a while that there are floods and old bridges are destroyed, in which rebuilding takes a long time.
So here is a temporary bridge that can be easily moved on two flat rack 20' containers. The bridge is 24 elements long and there are also two ramps.
In order to assemble and move the bridge, a larger mobile crane and a tractor are needed.
The bridge can be transported on two containers on a railway carriage, as well as the crane standing on a flat rack.
All new stickers prints are created in Microsoft PowerPoint and adapted to LDD standard.
Number of elements are 1039 including 5 strait tracks and a baseplate with river.